Storeboard/Blog/App Store review time
How long does App Store review take? An indie dev's real timelines
Apple has received the submission, but review has not started.
Apple's published goal, checked on 15 November 2026, is to review at least 50% of App Store submissions in less than 24 hours and 90% in less than 48 hours. That is a goal, not a guarantee. New apps, missing documents, rejections and the late-December rush can all stretch the wait, and after approval it can take up to another 24 hours for the app to go live.
The times, statuses and reasons in this article come from Apple pages I opened on 15 November 2026: Track a submission's review status, App Review, App and submission statuses and Overview of publishing your app. I have not pulled my own App Store Connect history into a table for this piece, so there are no personal "it took me X hours" numbers here.
On this page
How long does App Store review take?
Apple says App Review works around the clock with the goal of reviewing at least 50% of submissions in less than 24 hours and 90% in less than 48 hours. You will see that sentence on both the App Review help page and the App Review distribution page. Most submissions, Apple adds, are reviewed within 48 hours.
Treat those figures as a planning baseline, not a promise for your binary. Apple itself says updates with minor changes and bug fixes typically move through review quickly, and that other submissions may take longer to verify. If you need the app live on a Thursday, do not submit on Wednesday evening and call it a plan.
After the review is accepted, you are not always live immediately. If you chose automatic release, App Store Connect Help says it can take up to 24 hours to go live, and the Processing for Distribution status is described as ready for distribution within 24 hours. If you chose to release the version yourself, the app sits in Pending Developer Release until you release it.
What do Waiting for Review and In Review mean?
Waiting for Review means Apple has received your submission, but review has not started. You can still edit some information or remove items from the submission. You cannot upload or edit screenshots and app previews while you are in this status. That is why last-minute screenshot changes are a bad habit: once you click submit, those assets are frozen.
In Review means App Review is reviewing the submission. You can cancel it to remove it from review. Cancelling does not fix a problem in the binary; it just takes you out of the queue so you can change something and start again.
Apple has received the submission, but review has not started.
A few other statuses are worth knowing so the queue does not feel like a black box. Pending Developer Release means the app was accepted and is waiting for you to release it. Processing for Distribution means it is on its way to the store and should be ready within 24 hours. Rejected means the app was not accepted; Metadata Rejected means the metadata was not accepted, which is a different fix. Unresolved Issues means one or more items in the submission were rejected, and the rest cannot publish until you fix or remove them. Ready for Distribution is the green "this is ready to be on the store" status, assuming your agreements are in effect.
All of those names and descriptions are from Apple's App and submission statuses reference, checked on 15 November 2026. If the label in your account does not match, trust the current page in App Store Connect over this article.
Why is my app review taking so long?
If you are past 48 hours, the first job is to check the actual status rather than assume the binary is lost. Waiting for Review and In Review are different problems. A status that needs a reply from you, such as Unresolved Issues or a request for a demo account, will not move until you answer.
Apple lists three reasons some reviews take longer. The first is limited review history: apps with little or no prior App Review history may need more time. That is the usual reason a first submission feels slower than a later bug-fix update. The second is required documentation: authorizations, licenses, partnership agreements or other materials App Review has to confirm. The third is complex or novel issues: regulated content, new platform capabilities, enabled entitlements or other sensitive features.
Apple also says that when fraud or malicious activity is being investigated, review can extend. That is a serious category - misrepresented identity, store manipulation, hidden features - not a late icon change. Separately, an incomplete submission can delay review or fail it. The practical advice Apple repeats is to put a working demo account, clear notes and every required document in the App Review Information section before you submit.
Do updates get reviewed faster than new apps?
Often, yes, for small ones. Apple says updates with minor changes and bug fixes typically move through review quickly, and it lists limited review history as a reason some submissions take longer. A tenth update that changes a line of copy and a crash fix is the kind of thing that usually lands in the 24-to-48-hour window.
Version 1.0.1
- Crash on launch
- Fix typo
Version 2.0
- New entitlement
- Sign-in required
- Demo account needed
An update is not automatically fast. If you add a new entitlement, a login wall, a payment flow or a feature that needs a document, the review can look a lot like a first submission. Missing or expired demo credentials will get an update rejected just as they get a new app rejected. So plan a buffer for any update that changes how the reviewer signs in or what the app is allowed to do, not only for version 1.0.
How do I avoid rejections that reset the clock?
A rejection is not only a no. If the issue is in the build, Apple says you should upload a new build and submit that version, which starts a full review of the new build. That is how the clock resets. The way to avoid it is to send a complete, testable app the first time.
Fill the demo account and notes before you submit, so the reviewer can actually use the app.
If they only asked a question, reply there. Resubmitting starts a new review.
Fix every binary issue, then upload a new build. That version starts a full review.
A metadata rejection is listing work. Edit the field, then reply — you don’t need a new binary.
Before you submit: complete the App Review Information section, add a demo account that will still work when review starts, and include any license or partnership document Apple will need. If the app has several account types, Apple asks you to put additional credentials in the Notes field. If something needs a one-time code, put that in the notes too; Apple says that without it, a call may be required, and those calls are typically completed within three to five business days.
If App Review asks for more information and there are no other issues, Apple says you should reply in App Store Connect rather than resubmit. Resubmitting starts a new review, after which App Review can no longer reply to the previous message. Do not resubmit until you have resolved every issue they identified. Resubmitting with the same problems delays review and leads to the same outcome.
Metadata problems are not always a new binary. If the status is Metadata Rejected, read the message, edit the metadata, and reply. Guideline issues around screenshots, descriptions or other listing fields also need a clean listing, which is why I would rather fix that in Storeboard: ASO Assistant before I click Add for Review. The launch checklist and the post on guideline 4.3 rejections cover two of the common ways a listing sends you back to the queue.
Review looks at this metadata
Check the listing before you publish
Storeboard: ASO Assistant can run a “Review before publishing” check on the listing and screenshots against Apple’s App Review guidelines before you publish. In the screenshot it flags issues as “Likely to be rejected” or “Might be rejected,” each with a guideline number. It called out 2.3.10 for an iPhone screenshot that shows a TestFlight label on the app screen, 2.3.7 for a subtitle that reads as a list of keywords, and 2.3.12 for a What’s New text that only says “Bug fixes and improvements.” The same dialog offers “Fix with AI,” and buttons to “Go back and fix” or “Publish anyway.” It also says the checks run on your Mac, and that passing them does not guarantee approval.
Review before publishing
Storeboard checked your listing and screenshots against Apple’s App Review guidelines. These are the things App Review has rejected apps for. It’s your call — fix them first, or publish anyway.
2.3.10 iPhone screenshot 2 shows “TestFlight” on the app screen
Usually a “Back to TestFlight” status bar from a TestFlight launch, or a beta label. Retake it from the Home Screen or the Simulator.
What Storeboard read: TestFlight
In English (US)
2.3.7 Subtitle reads as a list of keywords
App Review rejects names and subtitles stuffed with keywords. Move the extra terms to the Keywords field.
In English (US)
2.3.12 What’s New only says “Bug fixes and improvements.”
For a release with real changes, App Review asks for them to be listed. Fine for a pure bug-fix release.
In English (US)
Checks run on your Mac. Passing them doesn’t guarantee approval.
Can I speed up App Store review?
The honest lever is a complete submission: a build the reviewer can actually use, notes that explain the app, documents attached, and no known crashes. Apple says providing that information up front can reduce review time. There is no official "pay to go first" button.
You can request an expedited review if you face extenuating circumstances, such as fixing a critical bug in the live app or releasing to coincide with an event you are directly associated with. The app must already have been submitted. Apple evaluates the request based on availability and demand, and it says expedite requests should be reserved for genuine urgency. A launch you simply want sooner is not the example Apple gives.
What does not speed things up: resubmitting to bump the queue, emailing a different address every day, or stripping features after you have already submitted and hoping the same review continues. If you need a date you can trust, submit early, use Pending Developer Release or a scheduled release, and let the approval happen before the marketing date.
Get the listing right before you submit
Storeboard: ASO Assistant is free to try on the Mac App Store, with 3 languages and 3 publishes to App Store Connect a month. Use it to write and localize listing copy and to keep metadata consistent before you click Add for Review. Storeboard Pro is a one-time US$49.99 early-adopter purchase that removes those limits. Storeboard can also run that check automatically: see Check the listing before you publish.
Questions
Does App Review work on weekends?
Yes. Apple's App Review pages (checked 15 November 2026) say App Review works around the clock, with the goal of reviewing at least 50% of submissions in less than 24 hours and 90% in less than 48 hours. That wording does not exclude weekends.
Does Apple's holiday period slow reviews?
It can, in late December, but you should check the current year's notice. As of 15 November 2026 I could not find a published 2026 holiday review calendar on Apple's developer news pages. In 2024, Apple wrote on 2 December that App Review would keep accepting submissions and that reviews might take longer from 20 to 26 December. If you have a late-December launch, watch developer.apple.com/news and submit early.
Do TestFlight external builds need review?
Yes, for external testers. Apple's TestFlight documentation (checked 15 November 2026) says the first build of a version submitted for external testing requires a full TestFlight App Review, and later builds of the same version might not. Apple does not publish a time target for that review, so do not assume it matches the 24- and 48-hour App Store figures. You can submit up to six builds for TestFlight App Review in a 24-hour period.
How long does Google Play review take by comparison?
Google's Play Console Help (checked 15 November 2026) says processing can take a few hours or up to seven days, or longer in exceptional cases, and it recommends planning at least a week between submitting and going live. That is a different process from App Store review, so treat it as a separate calendar, not a like-for-like swap.
What happens after my app is approved?
If you chose automatic release, App Store Connect Help says that after approval it can take up to 24 hours to go live, and the Processing for Distribution status is described as ready within 24 hours. If you chose to release the version yourself, the status is Pending Developer Release until you release it. A scheduled or phased release follows the option you picked in App Store Connect.
Can Storeboard check my listing against App Review guidelines before I publish?
Yes. Storeboard: ASO Assistant has a “Review before publishing” check that looks at the listing and screenshots against Apple’s App Review guidelines. In the screenshot it flags items as “Likely to be rejected” or “Might be rejected,” with guideline numbers such as 2.3.10 (a TestFlight label in a screenshot), 2.3.7 (a keyword-stuffed subtitle) and 2.3.12 (What’s New that only says “Bug fixes and improvements.”). It offers “Fix with AI,” and “Go back and fix” or “Publish anyway.” The checks run on your Mac, and passing them does not guarantee approval.
Sources
Pages opened on 15 November 2026 (Melbourne time). Where a page carries its own published date, I note that too.
- Apple: Track a submission's review status
- Apple: App Review
- App Store Connect Help: App and submission statuses
- App Store Connect Help: Overview of publishing your app on the App Store
- Apple: Provide information for a complete review (opened 24 November 2026)
- Apple: Request an expedited review
- Apple: Invite external testers (TestFlight App Review)
- Apple Developer News: Get your apps and games ready for the holidays (2 December 2024)
- Google Play Console Help: Control when app changes are reviewed and published
- Storeboard: ASO Assistant
- Storeboard pricing